Korça’s Prefect, Nertil Jole, recently shared photos of the cleaning work on the Sovjan collector, writing the following:
“A significant effort by the Korça Directorate of Irrigation and Drainage to clean the Sovjan collector, the main drainage project for the Maliqi area, with a length of 9.3 km and a volume of 53,000 m³ of alluvium.
This intervention will conclude after 25 days and addresses a highly sensitive issue for the residents and farmers of the area. Respect for the challenging work of Petrika and Eriskeli, who are working as excavators alongside their colleagues.”
EDITED by:
“KORÇA BOOM”